丰满人妻熟妇乱又伦精品,女性全捰艺术照摄影,亚洲精品卡一卡2卡3卡4卡,白袜校草被绑脱裤玩j

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: m.3388top.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
亚欧美无遮挡HD高清在线视频| 我和岳交换夫妇交换系列| 亚洲熟妇少妇任你躁在线观看无码| av无码一区二区三区| 亚洲日韩精品无码专区| 波多野结衣在线视频| 浪货 这么湿 趴好h| 中文人妻熟女乱又乱精品| 黑人巨大vs日本人优在线| 色婷婷香蕉在线一区二区| 人人妻人人澡人人爽人人精品av| 人妻少妇av无码一区二区| 人妻少妇看a偷人无码精品| 国产免费观看久久黄av片| 中国少妇xxxx做受| 成人动漫在线| 五十路熟妇高熟无码视频| 男男开荤粗肉np尿在里面| 男女做爰猛烈叫床爽爽小说| 国产亚洲色婷婷久久99精品| 亚洲av国产精品无码市川京子| 日韩AV无码久久精品免费| 欧美久久久无码精品亚洲日韩小说| 和邻居美妇疯狂作爱小说| 国语自产精品视频在线区| 欧美成人无码大尺度电影苦月亮| b站直播入口| 亚洲一区二区三区女厕偷拍| 亚洲成av人综合在线观看| 久久国产精品无码一区二区三区| 捆绑裸体bdsm酷刑| 久久午夜无码鲁丝片秋霞| 啊灬啊别停灬用力啊岳| 日韩精品一区二区亚洲av观看| 奇米777四色欧美在线视频| 精品无码三级在线观看视频| 性工具酷刑虐女惨叫小说| 最近中文字幕mv免费高清视频| 国产成人精品综合久久久久| 欧美亚洲国产精品久久高清| 浓毛老太bbwbbwbbwbbw看|